Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
I. Project Name: Street Light Project of Zengjiang Street, Zengzheng Road 2. Tendering Unit: Zengcheng Highway Administration Contact: Ms. Huang Telephone Tendering Agency: Guangzhou Hongye Jinji Construction Supervision Consulting Co., Ltd. Contact: Mr. Ye Telephone bidding supervision agency: Complaint telephone number of Zengcheng Construction Project Tender Management Office 3. Construction site: The starting point is Zengcheng Chinese Medicine Factory, and the ending point is Baihu Zhongqiao 4. Project Overview: The project is located in Zengcheng Street, Zengcheng City, and the starting point is Zengcheng. The Chinese medicine factory ends at Baihu Middle Bridge with a total length of 7080m. Construction and installation of street lighting projects with voltage level 10KV permanent power supply. The specific data is subject to the construction drawings and engineering quantity list.
V. Classification of tenders and the contents, scale and estimated price of bidding for each tender: a tender for this project. The content of the bidding is: The project is located in the urban area of Zengjiang Street, Zengcheng City. The starting point is Zengcheng Chinese Medicine Factory and the end point is Baihu Middle Bridge. The total length of the road is 7080m. The pole type, lamp power and spacing are all based on the existing street lamps. The poles are mainly located in the dirt shoulders on both sides of the road. The height of the ordinary street lamp pole is 12 meters, the length of the lamp arm is 1.5 meters, and the distance between the poles is about 35 to 40 meters. The specific pole spacing is shown in the plan view. The main street lamp of the ordinary street lamp uses a 400W half-cut type high-pressure sodium lamp. Estimated contract price: about 8 million yuan (the maximum value of the bid is subject to the pricing of the city's financial review center).
Zengcheng Construction Engineering Trading Center (No. 12, Hanglu Road, Yucheng Street, Zengcheng, Guangzhou)
9. Eligibility requirements for bidders:
1. The bidder's intention to participate in the bidding is clearly expressed. The bidder's representative is authorized to be valid and the prequalification application documents are prepared in the order of the bidder's qualified conditions. The consecutive page numbers are compiled and the total number of pages is marked in the catalogue. sign.
2. The bidders are all qualified as independent legal persons and hold the business license of the legal person issued by the administrative department for industry and commerce, and operate according to national laws.
3. The bidders hold the enterprise qualification certificate and safety production license issued by the construction administrative department;
4. The bidder has the professional contracting qualification for the second or higher level of urban and road lighting projects required for the project;
5. The bidder intends to be the project leader of the project as a registered construction engineer of the municipal public works or mechanical and electrical professional level 2 or above, and holds the project manager safety training assessment certificate (category B).
6. The bidder has completed the performance of similar quality projects in the Guangzhou area since June 1, 2006 (similar projects refer to the lower level of qualification level mentioned in point 4). It is necessary to provide the notice of winning the bid, the construction contract, and the completion acceptance certificate. If the above information cannot prove the technical indicators of the scale of performance (refers to area, height, span, pipe diameter, etc.), other information that can prove the technical indicators of performance shall be provided (the time and cost of the performance shall be subject to the notice of winning the bid).
Note: 1. The notice of winning the bid should be confirmed by the following units: Guangzhou Construction Engineering Trading Center and its branch, former Guangdong Construction Engineering Trading Center, former Guangzhou Construction Engineering Trading Center, and former Guangzhou Panyu District Construction Engineering Trading Center (tender Center), the former Guangzhou City Huadu District Construction Project Tender Management Office, the former Guangzhou Economic and Technological Development Zone Construction Engineering Trading Center, the Conghua City Construction Engineering Trading Center, and the Zengcheng Construction Engineering Trading Center. 2. For the professional project performance of individual bidding, it is necessary to provide the bidding notice, construction contract, completion acceptance report or completion acceptance certificate. The professional project performance subcontracted by the general contractor shall only provide the subcontract, completion acceptance report or completion acceptance certificate.
7. The bidder has signed and sealed the tender applicant's letter of commitment and statement in accordance with the contents of Annexes II, III, IV and V.
8. About the joint bidding: This project does not allow the joint bidding.
9. Before the qualification examination, the informant and the informative filing information of the bidder and the person in charge of the project have been published on the Guangzhou City Construction Network.
3. If the number of bidders who meet the eligibility criteria for qualification examination is less than 5, the bidding will fail. The tenderer analyzes the reasons for the failure of the bidding, amends the bidding plan, and re-organizes the bidding after being reported to the relevant management department for approval.
11. If the tenderer fails to apply for a change in bidding or non-tendering due to two or more bidding failures, the final public bidding shall cancel the bidder's performance qualifications.
12. Accept the registration and qualification examination, and select the best (if any) in accordance with the qualification examination documents (Annex 1).
13. The project sets the bidding control price according to the “Notice on Forwarding the “Gaodong Provincial Construction Department's Measures for Establishing the Maximum Value of Tendering and Bidding for Building Construction and Municipal Infrastructure Construction” (Sui Building [2006] No. 539).
14. For details of the information to be submitted when bidding applicants are required to register, please refer to Appendix 2, “List of Bidder Applicants for Filing and Submitting Materials” (in triplicate, one copy of the original, if the original and the copy are inconsistent, the original shall prevail) The validity period of all the promised expressions stated in the application documents of the bidding applicant shall be not less than 90 days. The information submitted in the “List of Bidder Applicants for Filing of Filings” is not required to be submitted, and is not considered as unqualified. in accordance with.
15. The bidding unit shall send the legal representative or its authorized representative to participate in the Balling Club on time. The Ballet will be witnessed under the witness of Zengcheng Construction Engineering Trading Center, and the specific time will be notified in writing.
16. The bidder may sign a complaint to the Zengcheng Construction Project Tender Management Office (020-82724170) for any illegal and unfair content in this announcement and the bidding documents.
17. This announcement was published on Guangdong Investment Investment Network (http://). The revision and supplement of this announcement was released on Guangdong Investment Investment Network. If the texts published in this announcement differ in the media, the text published on Guangdong Investment Merchants Network shall prevail.
18. The bidder must be responsible for the authenticity of the submitted information. If it is found to be fraudulent or reported, it will be cancelled immediately after being verified by the higher authorities, and will be publicized on the Internet. It is forbidden to participate in the bidding activities of all construction projects invested by Zengcheng at all levels of financial funds within two years, and the tenderee and The construction administrative department shall deal with it according to the commitment signed by the bidder.
19. The tender notice document and the bidding documents use the GZZB200612-017-1 bidding document template. The differences between this announcement and the contents of the template are underlined. All underlined parts are part of this announcement and have the same effect as other parts.
The above content is provided by WOSEN. WOSEN is a professional manufacturer and supplier of Led Flood Light, Led Street Light, Led Solar Light, etc. For more information, please visit https://www.wosenled.com/ or contact admin@wosenled.com or WhatsApp +86-13425434349
August 11, 2023
August 11, 2023
Mail an Lieferanten
August 11, 2023
August 11, 2023
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.